The total cost of Osh Water and Wastewater Rehabilitation Project Phase I is €8.45 million, including an EBRD loan of 3 mln Euro, an investment grant of 4.3 mln Euro and Euro 1.15 in technical cooperation by the Government of Switzerland through the Swiss State Secretariat for Economic Affairs (SECO).

The total budget of Phase II is about €10.7 million, of which €4.75 million is a loan from EBRD including €2.250 million co-financed by the EIB. €4.750 million is provided as a grant by the EU IFCA and €0.125 million is an investment grant of the Water Fund. €1.015 million has been allocated for post-signing Technical Cooperation.


Co-funded by the European Union
The Advisory Committee is a consultative and advisory body, designed to provide for effective inte...
Within Phase II of the Osh Water and Wastewater Rehabilitation Project6 financed by the EBRD and t...
On 6 February a meeting of Mr. Talant Baikishiev, Deputy Director of Oshvodokanal, with representa...
On June 22 the Advisory Committee of the Osh Municipal Water Company met again. The Advi...